Home / Services / SegWise Full Engineered Study
Our recommended standard
Full Engineered Cost Segregation Study
The gold-standard study done the way the IRS Audit Technique Guide expects: engineering-based, asset-by-asset, documented. A virtual or on-site inspection, component identification down to fixtures and specialty systems, and a fixed-asset schedule your CPA can load the day it arrives.
What you get
- ✓Virtual walkthrough or on-site inspection (on-site included for qualifying commercial)
- ✓Engineering-based reclassification of 5-, 7-, and 15-year components
- ✓Written, engineer-signed report with photos and methodology narrative
- ✓Fixed-asset schedule in Excel/QBO/CSV for your CPA
- ✓Prior-year catch-up calculation and Form 3115 preparation
- ✓Exit-model view of depreciation recapture at sale
- ✓Audit support included
How it works
Free proposal
Send your closing statement; we model your savings and quote a flat fee — usually the same business day.
Inspection & engineering
We schedule the walkthrough within days, identify components, and build the report with photo documentation.
File and save
Your CPA loads the schedule; you claim the deduction (and catch-up) on this year’s return.
Who it's for
Why engineered instead of a questionnaire study?
Do I need an on-site visit?
What bonus depreciation will apply?
Compare tiers before you commit
Rapid vs. Quick™ vs. Full Engineered — side by side, with honest recommendations for your property type.